CNSC letter to Bruce Power regarding regulatory hold point 2 (Bruce A Unit 3)
May 6, 2026
Mr. Maury Burton
Senior Director, Regulatory Affairs
Bruce Power Inc.
177 Tie Road
Tiverton, ON N0G 2T0
Subject: Bruce A NGS, Unit 3: Release of Regulatory Hold Point for Removal of the Guaranteed Shutdown State, Major Component Replacement
Dear Mr. Burton:
The purpose of this letter is to respond to Bruce Power’s request [1] to release the second regulatory hold point (RHP-2), allowing the Guaranteed Shutdown State to be removed in Bruce A NGS Unit 3, following the Major Component Replacement outage.
Canadian Nuclear Safety Commission (CNSC) staff’s assessment [2] concluded that Bruce Power has met all of the pre-requisites established by the CNSC for RHP-2. Therefore, as the person authorized by the Commission and pursuant to Licence Condition 15.5 of the Bruce Nuclear Generating Stations A and B Power Reactor Operating Licence 18.04/2028, I consent for RHP-2 for the guaranteed shutdown state to be removed for Bruce NGS Unit 3.
Yours sincerely,
Ramzi Jammal
Executive Vice-President and
Chief Regulatory Operations Officer
Regulatory Operations Branch
c.c: CNSC – A. Viktorov, A. Bulkan, J. Stevenson, Bruce RPD
Bruce Power – M. Rinker
References:
- Bruce Power Letter, M. Burton to R. Jammal, “Bruce A Unit 3: Request to Release of Regulatory Hold Point Phase B, Major Component Replacement”, January 30, 2026, BP-CORR-00531-06839.
- CNSC staff document, “Request by Bruce Power to Remove Regulatory Hold Point 2 for Prior to Removal of the Guaranteed Shutdown State for Unit 3”, dated May 5, 2026.