Protocols
CNSC Website User Survey
Share your experience in using our website by completing our survey. The survey should take you less than 10 minutes to complete.
Protocols are administrative agreements between the CNSC and a licensee. They provide a detailed process for both parties to follow in order to ensure regulatory compliance for a given project. Protocols outline the framework, milestones and service standards for licensing activities related to the project. See below for a list of the CNSC's protocols.
Bruce Power
- Bruce Power – CNSC Administrative Protocol for the Review of the Innovative LBLOCA Composite Analytical Approach
- Bruce Power Protocol with the Canadian Nuclear Safety Commission for Bruce Power Project 2030
Ontario Power Generation
- Ontario Power Generation - Canadian Nuclear Safety Commission Staff Protocol for the Darlington New Nuclear Project Licence To Construct Application (Revision 2, August 2024)
- Protocol between Ontario Power Generation and the CNSC for the Pickering Waste Management Facility (PDF) (November 2016)
- Protocol Between Ontario Power Generation and Canadian Nuclear Safety Commission Staff for the Darlington New Nuclear Project: Pre-Construction and Construction Licence Application Activities (PDF) (December 2021)
Canadian Nuclear Laboratories
-
Administrative Protocol between Canadian Nuclear Laboratories and the CNSC for the Nuclear Power Demonstration Closure Project (Revision 2 – July 2020)
- Appendix A (Revision 4, July 2020)
-
Administrative Protocol between Canadian Nuclear Laboratories and the CNSC for the Whiteshell Laboratories Proposed In Situ Decommissioning of the WR-1 Reactor (PDF) (Revision 1, September 2019)
- Appendix A (Revision 3, September 2019)
-
Administrative Protocol between Canadian Nuclear Laboratories and the CNSC for the Near Surface Disposal Facility Project at Chalk River Laboratories (PDF) (Revision 2, December 2019)
- Appendix A (December 2019)
NB Power
- NB Power–CNSC Staff Protocol on the Application for a Licence to Prepare a Site for an ARC 100 Reactor (Revision 2, July 2023)
- New Brunswick Power Nuclear - Canadian Nuclear Safety Commission Protocol for a satisfactory rating in the emergency management and fire protection safety and control area (PDF) (August 2011)
Other
- Protocol between the CNSC, Impact Assessment Agency of Canada (IAAC), and NWMO for the Integrated Impact Assessment of the Proposed APM project (147 KB, PDF)
- Operational Protocol for the Gunnar Project – 2016 (PDF) (May 2016)
- Operational Protocol for the Gunnar Project – 2015 (PDF) (February 2015)
- Protocol on the End of Commercial Operation of the Gentilly-2 Nuclear Reactor (PDF) (April 2013)
- Protocol between Atomic Energy of Canada Limited (AECL) and the CNSC for Re-Licensing Activities of AECL-owned sites: The Nuclear Power Demonstration, Gentilly-l and Douglas Point and Waste Management Facilities (PDF) (August 2012)
- Protocol for the GUNNAR Remedial Project: Environmental Assessment and Licensing Activities (PDF) (August 2012)
- Protocol on the operation of the Gentilly-2 nuclear power reactor and radioactive waste facility (PDF) (June 2011)
- Protocol for the Medical Isotope Project (PDF) (February 2011)
- Protocol for the renewal of Gentilly-2 Nuclear Power Plant and Radioactive Waste Facility operating licences (PDF) (December 2010)
- Protocol for the Restart of the NRU Reactor (August 2009)
- Protocol for National Research Universal (NRU) Licensing Activities (Revision 2, December 2010)
Page details
- Date modified: