Letter to Ontario Power Generation regarding Regulatory Hold Point 3
Regulatory Operations Branch
May 2, 2020
Mr. Dietmar Reiner Senior Vice President, Nuclear Projects Ontario Power Generation Inc. 1855 Energy Drive, 3C14 Courtice, ON L1E 0E7 |
Mr. Steve Gregoris Senior Vice President, Darlington Nuclear Ontario Power Generation Inc. P.O. Box 4000 Bowmanville, ON L1C 3Z8 |
SUBJECT: Darlington NGS - Unit 2 Return to Service: Request for CNSC Consent to Remove the Regulatory Hold Point for Reactor Power Increases prior to exceeding 1% Full Power
Dear Messrs. Reiner and Gregoris,
The purpose of this letter is to respond to Ontario Power Generation’s (OPG) request [1] to remove Regulatory Hold Point-3 (RHP-3), allowing OPG to proceed with operation between 1 % and 35% full power in the refurbished Unit 2 reactor at the Darlington Nuclear Generating Station (DNGS).
Canadian Nuclear Safety Commission (CNSC) staff’s assessments [2, 3] concluded that OPG has met all the pre-requisites established by the Commission to remove RHP-3. Therefore, as the person authorized by the Commission and pursuant to Licence Condition 15.4 of the DNGS Nuclear Power Reactor Operating Licence 13.02/2025, I hereby consent to the removal of RHP-3, allowing OPG to operate the Darlington Unit 2 reactor between 1% and 35% full power to conduct required Phase D testing activities.
Yours sincerely,
Ramzi Jammal
Executive Vice-President and
Chief Regulatory Operations Officer
Regulatory Operations Branch
c.c: G. Frappier, J. Burta, P. Elder, D. Newland, G. Lamarre, M. Rinker, K. Heppell-Masys, H.Tadros, C. Loreti, D. Desjardins, D. Nguyen, N. Abonasara, K. Hazelton, A. Mathai, C. Yacoub, Darlington Site Office
References:
- OPG letter, D. Reiner and S. Gregoris to R. Jammal, April 29, 2020 NK38-CORR-00531.
- CNSC staff document entitled: “Request by Ontario Power Generation Inc. to Remove Regulatory Hold Point for Prior to Exceeding 1% Full Power for Unit 2”, dated April 28, 2020.
-
CNSC staff memorandum: “Removal of Regulatory Hold Point 3 – Prior to Exceeding 1% Full Power for
Darlington NGS Unit 2”, DatedMay 2, 2020.
Page details
- Date modified: