Letter: CNSC authorizes removal of Regulatory Hold Point 4 for Darlington Unit 2
Regulatory Operations Branch
May 13, 2020
Mr. Dietmar Reiner Senior Vice President, Nuclear Projects Ontario Power Generation Inc. 1855 Energy Drive, 3C14 Courtice, ON L1E 0E7 |
Mr. Steve Gregoris Senior Vice President, Darlington Nuclear Ontario Power Generation Inc. P.O. Box 4000 Bowmanville, ON L1C 3Z8 |
SUBJECT: Darlington NGS - Unit 2 Return to Service: Request for CNSC Consent to Remove the Regulatory Hold Point for Reactor Power Increases Prior to Exceeding 35% Full Power
Dear Messrs. Reiner and Gregoris,
The purpose of this letter is to respond to the request [1] from Ontario Power Generation (OPG) to remove Regulatory Hold Point 4 (RPH-4), allowing OPG to proceed with operation above 35% full power in the refurbished Unit 2 reactor at the Darlington Nuclear Generating Station (DNGS). As established in DNGS Power Reactor Operating Licence (PROL) 13.02/2025 and its accompanying Licence Conditions Handbook, LCH-PR-13.01/2025 R003, RHP-4 marks the last hold point in the return to service of Unit 2 requiring Canadian Nuclear Safety Commission (CNSC) approval or consent to be removed.
CNSC staff assessments [2, 3] concluded that OPG has met all the pre-requisites established by the Commission to remove RHP-4. Therefore, as the person authorized by the Commission and pursuant to Licence Condition 15.4 of the DNGS PROL, I hereby consent to the removal of RHP-4, allowing OPG to operate the Darlington Unit 2 reactor above 35% full power.
Yours sincerely,
Ramzi Jammal
Executive Vice-President and
Chief Regulatory Operations Officer
Regulatory Operations Branch
c.c: G. Frappier, J. Burta, P. Elder, D. Newland, G. Lamarre, M. Rinker, K. Heppell-Masys, H.Tadros, C. Loreti, D. Desjardins, D. Nguyen, N. Abonasara, K. Hazelton, A. Mathai, C. Yacoub, Darlington Site Office
References:
- OPG letter, D. Reiner and S. Gregoris to R. Jammal, “Darlington NGS Refurbishment – Unit 2 Return to Service: Request for CNSC Consent Prior to Exceeding 35% Full Power (RHP 4)”, May 11, 2020, NK38-CORR-00531-21631.
- CNSC staff document entitled: “Request by Ontario Power Generation Inc. to Remove Regulatory Hold Point for Reactor Power Increases Prior to Exceeding 35% Full Power for Unit 2”, dated May 7, 2020.
- CNSC staff memorandum entitled: “Removal of Regulatory Hold Point (RHP-4) for Reactor Power Increases Prior to Exceeding 35% Full Power for Darlington NGS Unit 2”, dated May 13, 2020.