Letter to Ontario Power Generation regarding Regulatory Hold Point 4 – Darlington Unit 4

CNSC Website User Survey

Share your experience in using our website by completing our survey. The survey should take you less than 10 minutes to complete.

Regulatory Operations Branch

March 7, 2026

Mr. Allan Grace
Senior Vice President, Nuclear
Ontario Power Generation Inc.
1 Holt Road South, P.O. Box 4000
Bowmanville, ON  L1C 3Z8

Mr. Vince Smyth
Senior Vice President, Refurbishment
Ontario Power Generation Inc.
1855 Energy Drive, 3C14
Courtice, ON  L1E 0E7

Subject: Darlington NGS - Unit 4 Return to Service: Request for CNSC Consent to Remove Regulatory Hold Point-4, Prior To Exceeding 35 % Full Power

Dear Mr. Grace and Mr. Smyth:

The purpose of this letter is to respond to Ontario Power Generation’s (OPG) submission [1], which requested removal of Regulatory Hold Point-4 (RHP-4), allowing operation above 35 % full power for the refurbished Darlington Unit 4 reactor, and provided the associated Completion Assurance Document.

Canadian Nuclear Safety Commission (CNSC) staff’s assessment [2] of OPG’s submission [1], as well as of all supporting documentation, concluded that OPG has met all the pre-requisites established by the Commission to remove RHP-4. Therefore, as the person authorized by the Commission and pursuant to Licence Condition 15.4 of the Darlington Nuclear Generating Station Power Reactor Operating Licence 13.00/2045, I consent to remove RHP-4 and OPG may now proceed with operation above 35 % full power for the Unit 4 reactor.

Yours sincerely,

Ramzi Jammal
Executive Vice-President and Chief Regulatory Operations Officer
Regulatory Operations Branch
Canadian Nuclear Safety Commission

cc: A. Viktorov, A. Mathai, K. Hazelton, M. Rickard, C. Loreti, E. Delgado, A. El-Merhi, C. Brown, C. Chan, C. Badal, Darlington Site Office

References:

  1. OPG Letter, A. Grace and V. Smyth to R. Jammal, “Darlington NGS Refurbishment: Unit 4 Return to Service - Request for CNSC Consent Prior to Exceeding 35% Full Power (RHP4)”, NK38-CORR-000531-26652, March 4, 2026.
  2. CNSC staff document: “Request by Ontario Power Generation Inc. to Remove Regulatory Hold Point for Prior Consent Prior to Exceeding 35% Full Power (RHP4)”, March 7, 2026.