Letter to Ontario Power Generation regarding Regulatory Hold Point 2 – Darlington Unit 1
CNSC Website User Survey
Share your experience in using our website by completing our survey. The survey should take you less than 10 minutes to complete.
September 12, 2024
Mr. Allan Grace
Senior Vice President, Nuclear
Ontario Power Generation Inc.
1 Holt Road South, P.O. Box 4000
Bowmanville, ON L1C 3Z8
Mr. Boris Vulanovic
Senior Vice President, Refurbishment
Ontario Power Generation Inc.
1855 Energy Drive, 3C14
Courtice, ON L1E 0E7
SUBJECT: Darlington NGS - Unit 1 Return to Service: Request for CNSC Consent to Remove the Regulatory Hold Point for Prior To Removal of Guaranteed Shutdown State
Dear Mr. Grace and Mr. Vulanovic:
The purpose of this letter is to respond to Ontario Power Generation’s (OPG) submission [1], which requests removal of Regulatory Hold Point-2 (RHP-2), allowing the Guaranteed Shutdown State to be surrendered in the refurbished Darlington Unit 1 reactor.
Canadian Nuclear Safety Commission staff’s assessment [2] of OPG’s submission [1], as well as all supporting documentation, concluded that OPG has met all the pre-requisites established by the Commission to remove RHP-2. Therefore, as the person authorized by the Commission and pursuant to Licence Condition 15.4 of the Darlington Nuclear Generating Station Power Reactor Operating Licence 13.04/2025, I consent to remove RHP-2 and OPG may now proceed with surrendering GSS to restart the refurbished reactor at low power for testing and verification.
Yours sincerely,
Ramzi Jammal
Executive Vice-President and
Chief Regulatory Operations Officer
Regulatory Operations Branch
c.c: A. Viktorov, A. Mathai, M. Rickard, C. Loreti, E. Delgado, A. El-Merhi, A. Oussoren, A. Josua Tanoko, C. Brown, C. Chan, C. Badal, Darlington Site Office
References:
- OPG Letter, A. Grace and B. Vulanovic to R. Jammal, “Darlington NGS Refurbishment – Unit 1 Return to Service: Request for CNSC Consent Prior to Guaranteed Shutdown State (GSS) Removal (RHP2)”, September 6, 2024
- CNSC staff document entitled: “Request by Ontario Power Generation Inc. to Remove Regulatory Hold Point Prior to Surrender of the Guaranteed Shutdown State for Darlington Unit 1”, September 12, 2024