Language selection

Search


CNSC letter to Bruce Power regarding regulatory hold point 3 (Bruce A Unit 3)

May 21, 2026

Mr. Maury Burton
Senior Director, Regulatory Affairs
Bruce Power Inc.
177 Tie Road
Tiverton, Ontario N0G 2T0

Subject: Bruce NGS, Unit 3: Removal of Regulatory Hold Point for Increasing Above 1% Full Power, Major Component Replacement

Dear Mr. Burton:

The purpose of this letter is to respond to Bruce Power’s request [1] to remove the third regulatory hold point (RHP-3), allowing an increase above 1% full power in Bruce A Unit 3, following the Major Component Replacement outage. This request is pursuant to Licence Condition 15.5 of the Bruce Nuclear Generating Stations A and B Power Reactor Operating Licence 18.04/2028.

Canadian Nuclear Safety Commission (CNSC) staff’s assessment [2] concluded that Bruce Power has met all of the pre-requisites established by the CNSC to remove RHP-3.  As a person authorized by the Commission, I confirm that all the pre-requisites have been completed and the RHP can be removed. RHP-3 is hereby removed, and reactor power can now be increased above 1% full power in Unit 3.

Sincerely,

Ramzi Jammal
Executive Vice-President and
Chief Regulatory Operations Officer
Regulatory Operations Branch

c.c.: A. Viktorov, A. Bulkan, Bruce RPD (CNSC)
M. Rinker (Bruce Power)

References:

  1. Bruce Power Letter, M. Burton to R. Jammal, “Bruce A Unit 3: Request to Release of Regulatory Hold Point Phase C, Major Component Replacement”, February 12, 2026, BP-CORR-00531-06840.
  2. CNSC staff document, “Request by Bruce Power to Remove Regulatory Hold Point 3 for Prior to Increase Above 1% Full Power for Unit 3”, dated May 21, 2026.

Page details

Date modified: