Past Webcasts have been edited from the live versions for archiving purposes only and are only available in their original language. Webcasts do not form part of the official record of the proceedings.
Items 1 to 3
1. Opening Remarks
2. Adoption of Agenda
3. Approval of Minutes of Commission Meeting held September 15, 2011
Items 4 to 4.2.1
4. Status Reports
4.1 Status Report on Power Reactors
4.2 Early Notification Reports
4.2.1 Health Canada’s National Dosimetry Service: Calculation error discovered in the dosimetry management system used to determine the wrist and ring dosimeter doses
- Oral presentation by CNSC staff
Items 4.2.1 to 4.2.2
4.2.1 Health Canada’s National Dosimetry Service: Calculation error discovered in the dosimetry management system used to determine the wrist and ring dosimeter doses
- Oral presentation by National Dosimetry Services
4.2.2 Ontario Power Generation: Employee Dismissals for Code of Conduct Violations – Pickering Nuclear Generating Station
- Oral presentation by CNSC staff
Items 4.2.3
4.2.3 NB Power Nuclear: Small spill of heavy water at Point Lepreau
Nuclear Generating Station on December 13, 2011
- Oral presentation by CNSC staff
Item 5 to 5.1
5. Information Item
5.1 Nuclear Substances in Canada: A Safety PerformanceReport for 2010
- Oral presentation by CNSC staff
Items 6 to 7
6. Update on items from previous Commission proceedings
6.1 Cameco Corporation: Annual Update of the Beaverlodge Decommissioned Mine and Mill Site
- Oral presentation by Cameco Corporation
- Oral presentation by CNSC staff
7. Closing of meeting